Weija Dam Spill Gates Opened Following Heavy Rains

    Ghana Water Warns Residents of Downstream Flood Risk

    1 min read2 min listen

    Ghana Water Limited has opened the spill gates at the Weija Dam. This action follows a significant rise in the dam’s water level. The water now exceeds the safe operating capacity of 48 feet. This controlled release aims to protect the dam's structure.

    The dam experienced a surge in water levels due to recent heavy rainfall across the region. Stanley Martey, the company’s PR and Communications Director, confirmed the spillage. He stated that this is a necessary measure to prevent undue pressure on the dam. Ghana Water forecasts continued heavy rains. The Ghana Meteorological Agency predicts more rainfall upstream. This could prolong the spillage for several months. The exercise will continue until the water level returns to a safe point.

    This event highlights Ghana’s vulnerability to seasonal weather patterns and its impact on critical infrastructure. The dam's capacity is directly linked to rainfall, a trend observed annually during the rainy season. The pressure on infrastructure like the Weija Dam underscores the need for robust water management systems. Such events also put pressure on public finances for disaster response and mitigation efforts.

    Ghana Water has issued a strong advisory to the public. It urges all residents living near the river downstream of the dam to evacuate immediately. This is to ensure the safety of lives and property. The National Disaster Management Organisation (NADMO) and local district assemblies are preparing to clear obstructions. These obstructions hinder the free flow of water towards the sea.

    The implications of this controlled spillage are significant for the affected communities. Immediate evacuation orders are in place to prevent potential loss of life and property damage. Residents are advised to cooperate with emergency directives. Ghana Water's commitment to dam integrity and public safety remains paramount. Further updates will depend on rainfall patterns and inflow volumes into the dam.

    Comments

    Numbers behind the story +

    Source

    Original source link unavailable for this story.

    Figures used

    No structured figures were extracted for this story.

    How we checked it

    Before publication every StatsGH story must report a current, sourced statistic about Ghana, link to its source and not repeat an event we have already covered. Figures are taken from the source report as published and were current on 28 May 2026.

    About & Methodology · Glossary · Report or view corrections

    More from StatsGH