Energy Crisis Deeper Than Akosombo Damage Says Bawumia Campaign

    Director of Communications argues power outages preceded recent plant repairs

    2 min read2 min listen

    Dennis Miracles Aboagye, Director of Communications for the Bawumia Campaign, has stated that fixing the Akosombo hydro plant does not end Ghana's electricity outages, known locally as "dumsor." He insists the energy crisis existed long before the recent damage to the plant.

    Aboagye questioned narratives suggesting the energy crisis is over now that Akosombo is operational. He explained that power disruptions were already frequent. His own lights went off multiple times daily before the Akosombo incident. This indicates the problem is not due to a single event.

    Ghana's power sector faces ongoing challenges. Issues in regions like the Ashanti Region persist. Residents reported continuous outages even before the Akosombo problem. This suggests a broader, systemic issue than widely communicated.

    Aboagye criticized inconsistent communication about the energy sector. He believes official assurances create false expectations. He warned against premature declarations of success. According to him, calling Akosombo's repair "mission accomplished" means the real problem remains unsolved.

    The persistent nature of these outages affects daily life and business operations. Ghana's economy relies heavily on stable electricity supply. Frequent power cuts disrupt productivity. They also increase operational costs for businesses. This can deter investment and slow economic growth.

    The Energy Ministry has faced scrutiny over managing the power supply. Inconsistent messages about the availability and reliability of power can erode public trust. This situation also impacts investor confidence in the energy sector. Substantial investment is needed to ensure a stable and resilient power grid.

    Analysts suggest that the underlying causes of "dumsor" may include inadequate investment in infrastructure. Factors like aging equipment, transmission losses, and fuel supply challenges also contribute. Furthermore, the cost of power generation remains a significant concern for consumers and the government.

    The government has several initiatives aimed at improving the energy sector. These include expanding renewable energy sources and improving grid efficiency. However, the effectiveness of these measures depends on consistent implementation and adequate funding. The current debate highlights the urgency of addressing these deep-seated issues.

    The public's expectation is for reliable and affordable electricity. The continued "dumsor" raises questions about the government's capacity to deliver this. The Bawumia Campaign's comments suggest a focus on these broader systemic failures. This will likely be a key issue in future public discussions and policy debates.

    Comments

    Numbers behind the story +

    Source

    Original source link unavailable for this story.

    Figures used

    No structured figures were extracted for this story.

    How we checked it

    Before publication every StatsGH story must report a current, sourced statistic about Ghana, link to its source and not repeat an event we have already covered. Figures are taken from the source report as published and were current on 2 May 2026.

    About & Methodology · Glossary · Report or view corrections

    More from StatsGH