Ghana's thermal power plants burned 3,092,066 barrels of liquid fuel in 2025, according to the Energy Commission's Energy Outlook for Ghana 2026, dated May 2026.
About half was light crude oil (1,531,698 barrels). The rest was heavy fuel oil (1,040,335) and distillate fuel oil (520,033). The Commission says gas shortfalls forced some plants to switch.
The government now wants to stop buying liquid fuels for power in 2027. "The government aims to phase out liquid-fuel purchases for electricity generation by 2027," RMB's corporate and investment banking account posted on Monday morning. B&FT reported the same target on Friday.
Two versions of the claim
The Energy Minister, John Jinapor, has given the numbers differently on two occasions. At African Energy Week in Cape Town, Graphic reported on 14 October that Ghana had cut its liquid fuel purchases for power "from eight cargoes to two". Graphic said the switch "saved Ghana about US$500 million in a single year".
In Takoradi on 10 November, GBC and NorthCiti reported him saying gas output of about 400 million standard cubic feet a day had cut annual light crude imports "from six cargoes to two". Ending them by 2027, GBC wrote, was "expected to save the country approximately 500 million dollars annually". @ThePetroPulse repeated the Takoradi version on Friday.
So the same US$500 million has been reported as a saving already made and as one still to come. Neither version gives the size of a cargo or a breakdown of the saving, as Africa Briefing also noted.
What the Commission's data show
Liquid fuel use was heaviest early in 2025. January to June accounted for 78.2% of the year's barrels, and 84.8% of the light crude, by StatsGH's calculation from the Commission's Table 1.
Source: Energy Commission, Energy Outlook for Ghana 2026 (May 2026), Table 1. Monthly rows differ from column totals by 1–2 barrels in the source. We used the printed monthly totals for bar height.
For 2026, the Commission's base case planned 1.08 million barrels of heavy fuel oil for units at the AKSA plant, costing US$102.9 million. It projected that gas shortfalls would need a further 1,757,048 barrels of light crude or diesel, costing about US$175.7 million at US$100 a barrel. In its high-demand case, that rises to US$452.2 million.
A US$500 million annual saving from ending the remaining purchases would therefore be nearly three times the Commission's base-case cost of covering gas shortfalls in 2026. It would also exceed its high case. A saving would normally be smaller than the fuel bill it replaces, because the gas that replaces it also has to be bought.
What it means
The 2027 Budget (paras 692–693) says more gas from the OCTP fields, rising from 282 to 350 million standard cubic feet a day by 2028, will "reduce dependence on expensive liquid fuels". That is a reduction, not an end date.
Related: our stories on oil output and the state thermal plant.
The Energy Ministry was not asked for comment for this piece. We found no published breakdown of the US$500 million.
Limitations
The Commission's 2026 figures are projections made in May 2026, not actual purchases. Actual 2026 use may differ. The minister may have counted a different period, prices or fuels.
Cargo sizes are not published, so we cannot turn cargoes into barrels. Table 1's monthly rows differ from its printed totals by one or two barrels.
We used the printed totals. The PDF is a copy saved on 14 November; the live file could not be re-downloaded today.
Sources: Energy Commission, Energy Outlook for Ghana 2026 (May 2026), section 2.3.1, Table 1, section 3.3 and Tables 4–7. Graphic Online, 14 Oct 2026. Africa Briefing, 15 Oct 2026. GBC, 10 Nov 2026. NorthCiti Online, 10 Nov 2026. B&FT, 13 Nov 2026. Ministry of Finance, 2027 Budget Statement, paras 692–693. @RMBCIB on X, 16 Nov 2026. @ThePetroPulse on X, 13 Nov 2026. StatsGH, oil output story. StatsGH, state thermal plant story.